What you will build

Complete “Rename duplicate and color sheet tabs” using the visible Task, Owner, Status, Due sample so each action and the final state can be checked against the source data.

Learning objectives

Open the practice workbook

HANDS-ON PRACTICE

Practice in your own copy

Make your own Google Sheets copy with the same data, formulas, formatting, filter and frozen header. The original remains unchanged.

Make a Google Sheets copy (access required) ↗View original

Sign in to Google. If the original is not publicly shared, download the full workbook and import it into Google Sheets, or paste the example data into your own sheet.

The _result workbook shows the full source table before tab actions.

Hands-on practice

Step 1: Right-click the Example sheet tab, choose Rename, and rename it to Current.

The Example tab menu is open with the pointer directly on Rename.
The Example tab has been renamed to Current.

Step 2: Right-click Current, choose Duplicate, then rename the duplicated tab to Archive.

The Current tab menu is open with the pointer directly on Duplicate.
The duplicated tab has been renamed Archive.

Step 3: Right-click Archive, choose Change color, and select a green tab color.

The Archive tab menu is open with the pointer directly on Change color.
The Archive tab color palette is open with the pointer on Change color.

Step 4: Verify Current and Archive are adjacent, Archive shows the green tab color, and the source table still matches the checkpoint.

Final state: Current and Archive are adjacent, and Archive has a clearly visible green tab-color indicator.

Checkpoint

TaskOwnerStatusDue
Confirm briefLinhDone2026-09-28
Prepare datasetMinhWorking2026-09-30
Review outputAnPlanned2026-10-02

For formula lessons, result cells must be calculated rather than typed manually.

Common mistakes and fixes

Correction: return to the exact range and command named in the steps, then compare the live sheet with the Task, Owner, Status, Due source fields.

Independent practice

Add one row with the same schema, repeat the action, verify the new row behaves correctly, then remove it to restore the sample.

Key takeaways

  • ✓Rename Example to Current from the sheet-tab menu.
  • ✓Duplicate Current and rename the duplicate Archive.
  • ✓Use Change color on Archive and choose a light green color.
  • ✓Verify Current and Archive are adjacent and the source table is unchanged.
QUICK CHECK

Check your understanding

Answer four questions about the practice sheet.

1. Which command renames the Example tab?
2. How is Archive created?
3. Where do you change Archive color?
4. What must remain unchanged?

Next lesson

Continue in recommended learning order with Move and copy rows and columns.