What you will build
Complete “Make spreadsheets accessible” using the visible Task, Owner, Status, Notes sample so each action and the final state can be checked against the source data.
Learning objectives
Open the practice workbook
Practice in your own copy
Make your own Google Sheets copy with the same data, formulas, formatting, filter and frozen header. The original remains unchanged.
Sign in to Google. If the original is not publicly shared, download the full workbook and import it into Google Sheets, or paste the example data into your own sheet.
Hands-on practice
Step 1 — Inspect the table structure. Click the Name box to the left of the formula bar, type A1:D4, and press Enter. Confirm the selection contains exactly four descriptive columns—Task, Owner, Status, and Notes—and that each column contains one kind of information.
Step 2 — Verify the header treatment. Select A1:D1. Confirm that the Bold button (B) on the toolbar is active and that the header row uses a light green fill. Keep the four header cells separate; do not merge them.
Step 3 — Verify that status does not depend on color. Read C2:C4 and confirm the cells contain the words Done, Working, and Planned. Use Tab to move forward across a row and Shift+Tab to move back; each cell in the main table should remain directly reachable.
Checkpoint
| Task | Owner | Status | Notes |
|---|---|---|---|
| Brief | Linh | Done | Scope confirmed |
| Dataset | Minh | Working | Needs review |
| QA | An | Planned | Start after dataset |
Checkpoint for “Make spreadsheets accessible”: the Task, Owner, Status, Notes columns and sample records must still match this table after the lesson action.
Common mistakes and fixes
Before finishing, compare A1:D4 with the checkpoint: headers must be Task, Owner, Status, Notes; the Status column must contain text; and the main table must remain unmerged and keyboard-reachable.
Independent practice
Add a temporary fifth row using the same four-column schema, give it a text status such as Review, move across the row with Tab and Shift+Tab, then delete that temporary row so the workbook returns to the checkpoint state.
Key takeaways
- ✓Use descriptive column headers so the purpose of each field is clear.
- ✓Keep one kind of information in each column and avoid merged cells inside the main data table.
- ✓Make headers visually distinct; in this workbook A1:D1 is bold with a light green fill.
- ✓Do not communicate status with color alone—keep readable text such as Done, Working, and Planned.
- ✓Test the table with Tab and Shift+Tab, then compare A1:D4 with the checkpoint before you finish.
Check your understanding
Answer four questions about the practice sheet.
Next lesson
Continue in recommended learning order with Use dropdown chips for project status.
Comments
No comments yet. Be the first to join the discussion.