What you will build
Build a small content calendar with Content ID, title, channel, publish date, and status, then use COUNTIF to count items currently marked Scheduled.
Prepare the sample data
Open the practice workbook or make a copy. Make sure A1:E4 matches the sample below; Publish date should contain valid dates, and Status should consistently use Draft, Review, Scheduled, or Published.
Practice in your own copy
Make your own Google Sheets copy with the same data, formulas, formatting, filter and frozen header. The original remains unchanged.
Sign in to Google. If the original is not publicly shared, download the full workbook and import it into Google Sheets, or paste the example data into your own sheet.
Open the practice workbook in Google Sheets ↗
Count scheduled content
Step 1: Enter Scheduled count in H1. In H2, enter the formula below.
=COUNTIF(E2:E4,"Scheduled")Test a changed status
Step 2: Temporarily change E3 from Review to Scheduled. H2 should increase from 1 to 2. After verifying that change, restore E3 to Review; H2 should return to 1.
Checkpoint
| Content ID | Title | Channel | Publish date | Status |
|---|---|---|---|---|
| C01 | Getting started | Blog | 2026-10-01 | Draft |
| C02 | SUM basics | 2026-10-03 | Review | |
| C03 | Budget tutorial | Blog | 2026-10-05 | Scheduled |
With the table restored to the sample state, H2 should equal 1. If E3 is temporarily changed to Scheduled, H2 should equal 2.
Common mistakes and fixes
If the dates display unexpectedly, confirm that D2:D4 were entered as dates rather than plain text strings.
Independent practice
Add a fourth content item, choose one of the four standard statuses, and watch Scheduled count change as you move the new row into or out of Scheduled.
Key takeaways
- ✓Each content item uses one row with a unique Content ID, channel, date, and status.
- ✓Status labels must stay consistent for reliable counting.
- ✓COUNTIF(E2:E4,"Scheduled") directly counts Scheduled items.
- ✓With the sample data, the correct H2 result is 1.
- ✓Changing E3 to Scheduled and restoring Review confirms the formula responds correctly.
Check your understanding
Answer four questions about the practice sheet.
Continue learning
Previous lesson: Project timeline; Next lesson: Habit tracker.